Boiling hot & chilled filtered drinking water -instantly!
Zip HydroTap & Hydroboil: Boiling hot drinking water!
Delicious filtered drinking water and no plastic bottles!
Economical, energy efficient instant hot water!
All the latest Zip brochures: Yours to read & download!
Risk Assessment, Method Statements etc.
IV, IGS and 1 format
DWG and DXF format CAD
All the hard data you need to specify Zip in your project!
Zip saves water and energy - read more here!
Download your own Zip O&M Guides here
JPG, PDF and EPS format
Download latest Zip Warranty info here
Zip Instant Boiling Water: News around the world!
Meet some of the team that is forging our future...
Zip is proud to support the community that supports us.
The Zip Heaters story: UK & beyond!
Come and see Zip at these great exhibitions in 2010
Looking for a Zip video? Find it here.
Zip HydroTap a key feature in the world's tallest building!
Zip Instant Boiling Water scores 101 in Taipei!
Order your free copy today - or download now!
Zip Instant Boiling Water in state of the art spaces!
Zip Instant Boiling water at 30 St Mary Axe, London.
London's Kiss FM relies on Zip Instant Boiling Water
Ask us about Zip Dedicated Filter & Service Plans!
Learn how to use your Zip HydroTap's energy saving functions here!
Filtered water means no plastic bottles - ever!
Lord Foster's Greater London Authority Building, affectionately dubbed "The Beehive" is another British Architectural triumph featuring a Zip Instant Boiling Water system!
London City Hall - Foster and Partners' new Greater London Authority building - has become one of the most intriguing pieces of architecture in London. And this state of the art London building (affectionately known as the Beehive) has a Zip HydroTap on each of its floors!
Truly stunning in concept and execution and now very much an icon of the London skyline, the Beehive is the latest incredible innovative in building design from Lord Norman Robert Foster's multi award-winning international Architecture and Design practice, Foster and Partners.
The Beehive provides 17,000 square metres of accommodation on ten floors. As well as incorporating offices, it also includes an Assembly Chamber, Committee Rooms, Mayoral suite and Public Facilities. In order to provide staff with well-deserved facilities for making hot and cold drinks, Interior London, in conjunction with Consulting Engineer CKE Services, specified Zip HydroTap to be incorporated into specially designed staff amenities - located on each of the Beehive's nine floors.
**********
Download "Boiling Point" article here.